The WMS is up. The work is not
The system is on. Stock looks green. The shipment still ends with “just check that one”. Management sees a screen. The floor sees paper.
That is usually not a software defect. The item card is incomplete. Locations were never set. The rule dies at shift change. Blaming the product is easy. The real question: is the warehouse orderly enough to let the system hold the work?
Why Excel comes back
Excel does not vanish after go-live. It stays on the daily count. It stays on the customer-specific report. It stays on the side list opened because “the system is wrong”.
For a while both run. Then the system becomes an IT job and operations go back to Excel. If training lasted a day, item codes stayed messy, and the lead taught people to work around the system, that is not a surprise.
The project side of this →
Where it breaks before the project starts
Opening the scope as “turn everything on”. Fixing item and location lists a week before go-live. The implementation team walking the warehouse after lunch. Picking the Friday before a holiday as go-live day.
None of that sits on a slide. The invoice arrives later. A process written without walking the floor falls apart on the first busy day live.
Documented break points →